QualityInventory & Manufacturing
Check quality before work moves on.
An inspection gate, not a form somebody files.
7 days free. No card required.
Connected work
See how the work connects.
- 01
Start the work
Record measured or manual checks against a work order or asset.
- 02
Keep the record
Limits, measurements and any waiver resolve into a derived pass or fail.
- 03
See what changes
Review required checks and the first-pass yield of completed inspections.
What you can do
- Work-order and asset quality checks
- Manual or measured characteristics with minimum, maximum, target, and tolerance
- Derived pass or fail outcomes, with controlled waivers
- Required-check completion gates and completed-check first-pass yield
Play module video
Pharos / Product story
Quality
An inspection gate, not a form somebody files.
English audio and captionsRequirements & limits
What it needs
No additional module is required before this capability can be switched on.
Scope to confirm
There are no reusable inspection-plan templates, sampling or batch inspection, NCR disposition workflow, or per-unit defect rate.
Bring your exact workflow to a walkthrough and we will show where Pharos fits and where it does not.
Keep your work connected
Put it to work.
One administrator. Three chosen modules. No card required.